Commissioning

The purpose of commissioning is to ensure that after completion of the installation all (documentary) evidence is available to prove the integrity of the installation.The evidence should also prove that the installation is complete, correct, in compliance with the set criteria and fully operational.

The objective of commissioning is to verify that equipment, systems and facilities meet the design and engineering specifications and to obtain documentary evidence of this.

IxPlanta

These objectives are mainly achieved by carrying out inspections, checks and tests and reporting findings throughout the project. Quercus uses ixPlanta for commissioning. With this system we are able to deliver installations with all technical data, as built information, test results and verification data to proof compliance in a transparent and traceable way.


Download the Commissioning training description here.